Engineering Reference Toolkit

Plan your modular wastewater project with the right inputs.

Download ASM’s 47-page engineering guide, residential sizing calculator and site feasibility checklist. Define your project flow in U.S. gallons per day (GPD), identify missing inputs and prepare for an ASM technical review.

47-page PDF + sizing calculator + site checklist • One ZIP download

3D book mockup of the updated ASM Engineer’s Guide to Modular Wastewater Treatment.

Free download

Get the free engineering toolkit

Name, work email and company are all we need. Project details are optional.

Project details (optional)

Get the guide, calculator and checklist in one ZIP. Project details are optional. See our Privacy Policy for information about your data and choices.

Preliminary planning only—ASM engineering confirmation required. The toolkit does not constitute a final design, equipment selection, performance guarantee, quotation or regulatory approval. ASM and the project engineer must confirm project flow, loading, treatment requirements and equipment scope.

Preliminary planning only — ASM engineering confirmation required.

3D book mockup of the updated ASM Engineer’s Guide to Modular Wastewater Treatment.

Inside the toolkit

Three engineering resources, one ZIP download.

  • The Engineer's Guide to Modular Wastewater Treatment (PDF, 47 pages)
  • BIOASM sizing calculator (XLSX)
  • Site feasibility checklist (XLSX)
10–200 m³/day reference
≈ 2,642–52,834 GPD

10–200 m³/day reference

BIOASM model range
PT-50 – PT-1000

BIOASM model range

U.S. residential flow basis
Project GPD

U.S. residential flow basis

PT-series units are single-module SBR reactors. For residential projects, establish design flow in U.S. gallons per day using the number of homes or bedrooms and the corresponding flow allowance confirmed by the project engineer. ASM confirms final equipment selection and the complete treatment scope.

Written for project teams

Built for the people scoping the project

  • Civil & environmental engineers
  • Engineering consultants
  • Developers
  • Municipal teams
  • Resort & hospitality projects
  • Remote camps & industrial facilities

What’s Included

Three practical resources. One download.

Move from early project questions to a more organized feasibility discussion with technical guidance, preliminary sizing tools, and a site-readiness checklist developed around modular wastewater projects.

PDF Guide · 47 pages

The Engineer’s Guide to Modular Wastewater Treatment

A 47-page technical reference covering SBR and MBR treatment, residential design inputs, installation, operations and the information ASM needs to review your project.

Excel Tool

BIOASM Sizing Calculator

Screen a preliminary SBR model using documented project GPD, or homes or bedrooms multiplied by a project-confirmed flow allowance. No default residential allowance, equipment pricing or lifecycle-cost estimate is included.

Excel Checklist · 49 items

Site Feasibility Checklist

Organize 49 project and site checks, record unresolved items and prepare the information needed for an ASM engineering review.

Preliminary planning only—ASM engineering confirmation required. The toolkit does not constitute a final design, equipment selection, performance guarantee, quotation or regulatory approval. ASM and the project engineer must confirm project flow, loading, treatment requirements and equipment scope.

What you will learn

Answer the questions that decide a project early.

Aerial view of an ASM packaged wastewater treatment plant in operation
  • 01

    When modular treatment is a viable alternative to conventional construction.

  • 02

    How SBR and MBR approaches differ, and when project-specific engineering is required.

  • 03

    How to estimate preliminary design flow and identify an initial BIOASM model range.

  • 04

    What site, electrical, civil, permitting, operational, and discharge questions must be resolved.

Process

The four-phase BIOASM SBR cycle

ASM’s standard reference cycle lasts six hours, with four cycles per day. Final operating settings require project-specific confirmation.

  1. 01

    Feed and aeration

    1 hour

    The feed pump and blower operate together.

  2. 02

    Additional aeration

    3 hours

    Feeding stops while the blower continues. Total aeration is four hours, including Phase 1.

  3. 03

    Settling

    1 hour

    Pumps and blower stop while solids settle.

  4. 04

    Discharge and chlorine dosing

    1 hour

    The treated-water discharge pump and chlorine dosing pump operate together.

  • Sludge removal. Excess sludge removal follows sludge observations and the operating plan.
  • Controls. Standard analog time-clock manual/automatic operation with illuminated fault indicators. PLC, SCADA, communications and added instrumentation are optional and subject to quotation.
  • Disinfection. Standard inline chlorine dosing does not include a separate chlorine-contact tank.
  • Filtration (optional). Includes backwash equipment and requires treated-water storage when added.

The packaged system

Factory-built treatment, delivered as a module.

BIOASM PT-1000 packaged wastewater treatment plant installed on a prepared pad

BIOASM PT-1000 in service

BIOASM PT-1000 SBR package: upper reference hydraulic capacity of approximately 52,834 GPD (200 m³/day). Primary settling, equalization, downstream treatment and site integration are defined for each project. Final selection requires ASM engineering confirmation.

Municipal packaged treatment plant supplied by ASM at a utility site

ASM installation

Packaged treatment installation supplied by ASM. Site planning should account for the prepared foundation, incoming wastewater connections, power supply, and treated-water discharge route. Access for installation, inspection, and routine maintenance should be reviewed alongside the treatment layout. Final equipment scope and site integration require ASM engineering confirmation.

Packaged wastewater treatment plant installed at an industrial district

ASM installation

Factory-built package units sited near the load they serve. Project planning should establish the wastewater flow and characteristics, available footprint, and connections to the collection and discharge systems. Equipment access, electrical requirements, and operating arrangements also need review. Model selection and any supporting treatment stages are confirmed for each project by ASM.

Packaged treatment units installed at a remote community site

ASM installation

Packaged units for sites where cast-in-place construction is impractical. Early feasibility review should consider delivery access, foundation requirements, available utilities, and the proposed discharge location. The site checklist helps capture these conditions and identify questions for the project team. Treatment configuration and installation requirements remain subject to project-specific engineering review.

ASM packaged treatment plant installation at an international project site

ASM installation

Packaged treatment installation supplied by ASM. Each project needs a defined flow basis, an assessment of wastewater characteristics, and a review of local permitting and discharge requirements. Civil works, utility connections, and ongoing operating responsibilities should be established before final selection. Use the toolkit to organize preliminary inputs for an ASM technical review.

ASM control panel with indicator lights and selector switches for a packaged treatment system

Controls and instrumentation

Standard controls: analog time-clock manual/automatic operation with illuminated fault indicators. PLC, SCADA and added instrumentation are optional and quoted separately.

Photography shows BIOASM packaged treatment installations. Final configuration, footprint, and equipment scope are project specific.

Manufacturer

Built by an established treatment manufacturer.

ASM designs and supplies water and wastewater treatment systems, with U.S. operations based in Houston, Texas.

Houston, TX

U.S. operations

130,000 sq ft

Production area

65+

Expert staff

450+

Completed projects

BIOASM PT-500 packaged treatment plant installed at a forested site

BIOASM PT-500 · factory-built single-module SBR package

Applications

Where modular treatment fits.

Residential subdivisions

Decentralized communities without access to municipal collection.

Hotels, resorts, RV parks

Seasonal and variable-load hospitality and campground projects.

Workforce & mining camps

Remote facilities requiring rapid deployment and relocation.

Municipal capacity

Interim or staged expansion of existing municipal treatment capacity.

Industrial applications

Selected industrial streams requiring project-specific evaluation.

Remote & island sites

Locations where conventional plant construction is impractical.

How to use the toolkit

Establish flow. Record conditions. Request a review.

01

Establish project flow

In the calculator, choose Project GPD and enter your documented design flow, or choose Residential calculation and enter homes or bedrooms with the matching allowance confirmed by your project engineer.

02

Record site conditions

Complete the checklist and identify items that still need confirmation, including wastewater characteristics, effluent requirements, utilities, access and permitting.

03

Request an ASM review

Send ASM your completed calculator, checklist and available project information. ASM reviews the treatment approach, equipment scope and remaining requirements before preparing a project-specific quotation.

Get the toolkit

Download the engineering toolkit.

One ZIP file with the engineer’s guide, the BIOASM sizing calculator and the site feasibility checklist.

ASM packaged wastewater treatment units installed on a prepared siteASM packaged installation
  • Engineer's GuidePDF · 47 pages
  • BIOASM Sizing CalculatorExcel · BIOASM PT-50 to PT-1000
  • Site Feasibility ChecklistExcel · 49 items

Instant download after submitting. ASM may contact you about your request.

Free download

Get the free engineering toolkit

Name, work email and company are all we need. Project details are optional.

Project details (optional)

Get the guide, calculator and checklist in one ZIP. Project details are optional. See our Privacy Policy for information about your data and choices.

Preliminary planning only—ASM engineering confirmation required. The toolkit does not constitute a final design, equipment selection, performance guarantee, quotation or regulatory approval. ASM and the project engineer must confirm project flow, loading, treatment requirements and equipment scope.

FAQ & About ASM

Before you download.

ASM designs and supplies water and wastewater treatment systems, with U.S. operations based in Houston, Texas. The BIOASM standard SBR range covers PT-50 through PT-1000 for decentralized projects. The toolkit is planning-level reference material intended to support early evaluation.

Download the toolkit

Free · instant download after submitting

Preliminary planning only — ASM engineering confirmation required. This toolkit supports conceptual screening and does not constitute a final design, equipment selection, performance guarantee, quotation or regulatory approval. ASM Water Treatment Systems and the project engineer must confirm capacities, dimensions, electrical requirements, process configuration and treatment performance for the specific project.